Wiser Projects submitted a detailed “Phase One” report – which describes their findings, and the work we would need to do next to produce an actual “master plan” for the cathedral precinct. The report is available to download here:
The following two documents describe the next steps of the “master plan” for the cathedral precinct. As was decided at our May 15, 2022 SGM, we are now moving forward with these plans.
Please read the Phase Two report and summary available to download below: